18240SHIVNATH EXPRES

The 18240 SHIVNATH EXPRES train route runs between NETAJI SUBHASH and KORBA, with Daily timetables.

Daily 1 trip

Trips start at 11:55 PM.

Valid until Aug 30, 2027.

To KORBA

NETAJI SUBHASH NITR 11:55
KAMPTEE KP 12:09+112:11+1
BHANDARA ROAD BRD 12:44+112:46+1
TUMSAR ROAD TMR 1:01+11:03+1
TIRORA TRO 1:18+11:20+1
GONDIA JN G 1:48+11:50+1
AMGAON AGN 2:05+12:07+1
DONGARGARH DGG 2:48+12:50+1
RAJNANDGAON RJN 3:13+13:15+1
DURG DURG 4:05+14:10+1
BHILAI POWER HOUSE BPHB 4:19+14:21+1
BHILAI BIA 4:27+14:29+1
RAIPUR JN. R 5:00+15:05+1
TILDA TLD 5:36+15:38+1
BHATAPARA BYT 5:58+16:00+1
BELHA BYL 6:30+16:32+1
BILASPUR JN. BSP 7:15+17:25+1
AKALTARA AKT 7:50+17:52+1
JANJGIR NAILA NIA 8:05+18:07+1
CHAMPA CPH 8:22+18:24+1
KORBA KRBA 9:20+1
  • PM times are in bold.
  • +1: after midnight, the next day.
  • Two times: arrives, then departs.
  • Times in grey are approximate.
All routes